
Project Basic Information:
Project Name:
Ghana Temporary Construction Worker Camp Project
Location:
A newly developed open area in Ghana
Application Scenario:
Construction industry (temporary accommodation and offices for workers)
Core Products:
Flat-pack containers, expandable containers
Project Scale:
The camp integrates multiple functional areas, including office spaces, dining areas, bathing facilities, and dormitories.
Main Challenges:
Rapid Construction and Flexible Layout:
The construction project had a tight timeline, requiring quick provision of temporary living and office spaces for workers. The camp layout needed to be adaptable to the on-site terrain conditions.
Transportation and On-Site Management:
The construction site was a newly developed open area where loose components were prone to loss. A solution that facilitated easy transportation and on-site storage management was essential.
Basic Living Standards and Cost Control:
It was necessary to provide workers with accommodation and sanitation facilities that met basic living requirements within budget, while ensuring structural safety (fire resistance, wind resistance, and earthquake resistance).



Last updated: 2025-09-08